Pipeline Installation Analysis
Bumi Armada, 2025
Pipelay with the vessel Mermaid Resilient: pipelaying, push-pull, mooring and lifting analysis.

Details
.png%3Fv%3D1795036118565&w=3840&q=85)



| Project | Client / End User | Year | Mooring & Marine Scope |
|---|---|---|---|
| FPSO Anoa mooring chain replacement (6 legs), Natuna Sea | PT Buwana Kreasi Internasional / Harbour Energy | 2026 | Seakeeping, mooring integrity and excursion; T&I design basis |
| Quiluma & Maboqueiro platform T&I, Gulf of Angola | Vantris Energy (formerly Sapura) / Azule Energy | 2025 | Anchor pattern; installation and side-by-side mooring |
| 36 Wellhead platform removals and 13 spools, Gulf of Thailand | Fourcask, Mermaid / Chevron Thailand | 2024-2025 | Mooring and anchor patterns; lifting; transport and seafastening |
| Soekarno-Hatta 24-inch pipeline and 50,000 DWT SPM | PT Rekayasa Industri / Pertamina | 2021-2023 | SPM and PLEM installation; mooring; transport |
| STAAD Pro and floating power plant moorings: New Caledonia, Sulawesi, floating gas power plant | Confidential | 2022-2023 | Mooring pattern; line tension and offset; anchor capacity |
| FSO Abherka floating hose integrity, Madura | PT Trimulya Gemilang | 2021 | Coupled FSO, mooring and hose model |
| RDMP Balikpapan oil boom | KSO Adhi-Rekind | 2021 | Mooring and anchor design; dynamic simulation |
| Floating PV mooring and anchoring: Cirata, Karangkates, Saguling, Kamburu (Kenya) | ACWA Power (PLN), SGS, ILF | 2019-2025 | Mooring layout and analysis; anchor design; BoQ |

Bumi Armada, 2025
Pipelay with the vessel Mermaid Resilient: pipelaying, push-pull, mooring and lifting analysis.

Vantris (formerly Sapura), 2024
Installation engineering for subsea pipelines in the Gulf of Thailand.

PT Trimulya Gemilang, 2021
Two double carcass hose strings on FSO Abherka, Madura, modelled with the FSO and its mooring.

KSO Adhi-Rekind, 2021
RDMP Balikpapan: mooring and anchor design, anchor strength, dynamic simulation.

PT MSI, 2020
Fleet upgrade support: mooring, towing and lifting stability, reviewed by an independent third party.

PT Putra Tunggal Mandiritama, 2020
Accommodation work barge and pipelay barge: stability, lifting and pipelaying analysis.

Indonesian EPCI Company
Deck strength analysis in Ansys, for MWS approval of transportation and installation.

Indonesian EPCI Company, 2020
Blast wall analysis on an FPSO in Abaqus.

McConnell Dowell Indonesia, 2020
Three jacket intake heads, 108.3 tons in total, from Cilegon to Benete for Amman Batu Hijau.

PT Trimulya Gemilang, 2021
Diesel engine generator transport, to MWS approval.

PT Samudera Tanggoh Abadi, 2020
Cargo lifting, transportation and seafastening for the Tanggoh UCC project.

SMEC Denka, 2022

SMEC Denka, 2022

SMEC Denka, 2022

Worley, 2023
Front end engineering design of the new jetty at the PETRONAS LNG Complex.
Confidential, 2022
Confidential, 2023
Confidential, 2023

Confidential client, 2020
Two-year blanket contract for upstream processing facilities, with 35 Engineering.

KSO Adhi-Rekind, 2019
Flare relocation, Balikpapan: soil data review, pile drivability and stick-up.

PT Bumi Siak Pusako, 2020
51 km gas pipe-pipe and spool stress in one integrated model.

PT Duta Hitta Jaya, 2021
Bailey bridge as emergency bridge for disaster areas: in-place, fatigue and seismic analysis.

KSO Adhi-Rekind, 2020
Flare relocation, Balikpapan: pile drivability and stick-up calculation.